The new system, installed in place of the old converter that had reached the end of its service life, was engineered and supplied by Primetals Technologies. The renovation work covered the main components, and as part of the modernization, a new air-cooling system was introduced, which will extend the equipment’s lifespan and reduce maintenance needs. Additionally, Primetals Technologies provided consultancy support for the construction process.
The long-term collaboration between Primetals Technologies and voestalpine continues to strengthen, with projects such as the bloom caster implemented at Donawitz and the order for an electric arc furnace at the Linz facility.
Comments
No comment yet.