The Environmental Impact Assessment (EIA) process for the "Habaş Ankara Solar Power Plant (SPP)" project of Habaş Industrial and Medical Gases Production Industry Inc. has been officially initiated. The EIA application file was prepared by En-Çev Enerji A.Ş. and has been reviewed.
The solar power plant, to be constructed in Polatlı, Ankara, is estimated to cost ₺2,628,169,632.
Upon completion of the project, a 191 MWm/170 MWe/191 MWp solar power plant will be established, utilizing 347,274 solar panels. The plant will generate an annual electricity output of 295,632,263 kWh.
Comments
No comment yet.